UPGRADING OF AN EXISTING COMPACT WATER TREATMENT PLANT
/
المؤلف
MOHAMED,KHALED SAEED ABDELMONEM
هيئة الاعداد
باحث / خـالـد سـعـيـد عبدالمنـعم محمد
مشرف / محمد الحسيني عبد الرحمن النادي
مناقش / أسامة فتحي محمود
مناقش / طارق اسماعيل محمود صبري
تاريخ النشر
2023
عدد الصفحات
98P.:
اللغة
الإنجليزية
الدرجة
ماجستير
التخصص
الهندسة المدنية والإنشائية
تاريخ الإجازة
1/1/2023
مكان الإجازة
جامعة عين شمس - كلية الهندسة - اشغال عامة
الفهرس
Only 14 pages are availabe for public view

from 120

from 120

Abstract

Compact Water treatment plants was established to solve the problem of water supply in villages as a quick solution, but with the increase in population and poor maintenance of compact units, the actual production capacity became not equal to the capacity of its design, so the tendency was to remove these units and build new water treatment plants with a high cost and thus do not achieve any benefit from the current units.
This study aims to increase the capacity of compact water treatment plant and applied on El-Warrak compact water treatment plant by developing its hydraulic capacity and maximize its productivity without affect the produced water quality or need more land with minimum possible modifications.
Developing the sedimentation basin at the WTP that uses the plate settler system, through a laboratory comparison on laboratory models between three types of sedimentation units followed by three types of filtration units, and the results of the removal efficiency after each of them were within the permissible limits that allow the application.
The technical comparison between the nine proposals (Each sedimentation unit of the three proposed systems in the study is followed by three types of filters) resulted that the best solution was the proposal which is converting only four plate settlers to tube settlers and & eight rapid sand filters to triple media filters that achieves increasing the capacity of sedimentation unit from 2400 m3/day to 10324.8 m3/day it means increasing the capacity by 4.3 times the old one,
The total cost of vertically upgrading the existing water treatment plant is 28,80 million Egyptian pounds while the total cost of removing existing plant and building new one will be 103,85 million Egyptian pounds this means that vertical upgrading for the existing plant saves about 72.26 % of the total cost of horizontal upgrading the existing water treatment plant.